Sprint 2 — Sep 21 to 25
Planned at the end of Sprint 1; the Oct 1 items carried as candidates.
Placeholder. This sprint is planned on Friday Sep 18, at the end of Sprint 1, from what reached its Definition of Done and what was carried. Deadline Friday Sep 25.
Candidates
Section titled “Candidates”The Oct 1 items not closed in Sprint 1, in the order they were attempted:
- Deleting the docs sandbox (
docs/website/src/components/sandbox/, its fixtures script and capture), unreachable since the redirect. - Backends for the screens disabled in Sprint 1: library, guide, deploy.
- The sales site past the draft, scoped from the CEO’s feedback on Friday.
- The accuracy figures published, once the label review clears them.
- Azure and GCP past where the Thursday attempt stopped, if it stopped.
- The router’s per-page pin (ADR-0050), not attempted in Sprint 1; the mixed-page sample and the multi-parser scenario Sprint 1 ships are its proof.
- The recipe format as an ADR and the few-shot workflow past the first Draw.io file.
- The comparison table’s remaining axes, and the labelled data they need.
- The CAD scope page, carried whole from Sprint 1.
- The AWS
cutoverjob runs the public smoke but notjust test::bdd::deployedorjust frontend::e2e-deployed, which thedeployjob does run; a cutover therefore proves less than a deploy does.
To fill in on Sep 18
Section titled “To fill in on Sep 18”Highest-risk questions, tasks, Definition of Done and validation per workstream, in the shape of the Sprint 1 page.